In operation

Long-term lease to a wind operator

The Punta Colorada Wind Farm (20 MW, 10 turbines) has operated on our land since 2011 under a long-term land lease. The operation is verifiable in Chile's public electricity-sector records.

Ongoing

Management of electrical and right-of-way easements

More than a dozen easements from various owners, registered between 2008 and 2025, cross or access the property. We manage their creation, access for works and maintenance, and coexistence among occupants, including a 2026 access easement for the Kimal–Lo Aguirre HVDC line, Chile's largest transmission project. An uncommon capability among landowners.

In operation

Step-up substation within the property

The Punta Colorada Substation (220 kV), a step-up substation, sits and operates within the property, raising the voltage of local generation for injection into the transmission system: critical electrical infrastructure coexisting with the other land uses.

Current

Land reservation for a solar PV project

A power generation company holds a paid reservation of approximately 200 hectares for the development of a solar PV plant.

In development

Battery energy storage (BESS)

A battery energy storage project is under development on the property.

How to work with us

A familiar process, no surprises

We know the path from a first conversation to a decades-long contract, because we have walked it before.

  1. 1

    Initial conversation

    Tell us what your project needs: acreage, use, timeline. We respond with what the property can offer.

  2. 2

    NDA and technical information

    Under a non-disclosure agreement we share detailed technical and legal information about the property.

  3. 3

    Study easement or option

    We formalize an evaluation stage: study easement, reservation or option, depending on what the project requires.

  4. 4

    Long-term contract

    A lease, permanent easement or other structure, designed for the full life of the project.