Punta Colorada Wind Farm turbines above the semi-arid hills of the property, in La Higuera.
Photographic recordPunta Colorada Wind Farm, on the property · La Higuera, Coquimbo
Photo: Government of Chile · CC BY 2.0
Availability

Available land next to the grid connection

Within a property of some 10,000 hectares where power generation, transmission infrastructure and easements from different holders already coexist. The available land is not an isolated plot: it is acreage adjacent to operations that already run, concentrated in the sector of the property where the substation operates.

Grid connection

The grid connection is already on site

It is the attribute that sets this land apart from any other parcel available in the region.

In operation

220 kV step-up substation

Sits and operates within the property, raising the voltage of local generation for injection into the transmission system.

In operation

Four 220 kV lines

Cross the property or originate on it, with easements constituted, registered and managed by us.

Constituted

Access for the Kimal–Lo Aguirre HVDC line

Access easement for Chile's largest transmission project, constituted over the property.

Property overview

Property
Estancia El Chañar, La Higuera municipality, Coquimbo Region
Total area
About 10,000 hectares
Available area
Sectors are available for new projects, with varying terrain. The precise area and its distribution are detailed under a non-disclosure agreement.
Access
Direct frontage on Route 5 North, at km 554.
Extent and terrain
The property runs several kilometres inland from the highway; semi-arid Coastal Range hills.
Topographic suitability
The property combines flat and gently sloping sectors with others of steep relief. Based on a public elevation model of about 30 metres, close to 5% of its area lies below 5% slope, some 9% between 5 and 10%, some 6% between 10 and 15%, and the remaining 80% above 15%. Of the low-slope land, about 800 hectares lie within 3 kilometres of the step-up substation. This is a screening analysis, useful for a first feasibility assessment, not for plant design.
Electrical infrastructure
220 kV transmission lines cross the property; a 220 kV step-up substation operates within it
Easements
More than a dozen right-of-way and electrical easements from various owners, managed by the company
Renewable resource
Solar irradiation of 2,290 kWh/m²/yr (GHI) and 2,720 kWh/m²/yr (DNI) per the Global Solar Atlas. GHI is the solar energy received by one horizontal square metre per year, the standard measure for estimating a photovoltaic plant's output; DNI is the fraction arriving as direct beam radiation, relevant for trackers and concentration. Wind potential is proven by the 20 MW wind farm operating since 2011.
Water
The property holds water rights
Mineral resource
Iron-and-copper district of Chile's Norte Chico, with mineral and geological potential consistent with Sernageomin's public information
Conservation
CONAF forest conservation area within the property
Legal status
Clean title, no litigation
Status
In operation, with acreage available
ROUTE 5220 kV (schematic)220 kV substationPunta ColoradaTollinlandPacific Ocean71°04′ W29°26′ SN0 2 4 km

Reference outline of Estancia El Chañar, without boundary detail. Detailed technical and legal information available under a non-disclosure agreement.

Topographic suitability

Where the developable land is

The industry standard for a solar project calls for gently sloping land and a substation no more than ten kilometres away. On this property, the lowest-slope land is concentrated around the substation, not far from it.

220 kV substationSlope below 10%
Reference zone, derived from a public elevation model
On the property today

Land that already produces

In operation

Punta Colorada Wind Farm

The Punta Colorada Wind Farm (20 MW, 10 turbines) has operated on the property under a long-term lease since 2011.

In operation

Punta Colorada step-up substation

The Punta Colorada Substation (220 kV), a step-up substation, sits and operates within the property, raising the voltage of local generation for injection into the transmission system.

Current

Solar reservation

Approximately 200 hectares reserved by a power generation company for the development of a solar plant.

In development

BESS storage

A battery energy storage project in development.

Ongoing

Managed easements

More than a dozen right-of-way and electrical easements from various owners, registered between 2008 and 2025, including an access easement for the Kimal–Lo Aguirre HVDC line, Chile's largest transmission project.

Mining potential

Land in an active mining district

Estancia El Chañar sits in a district with a long mining tradition in Chile's Norte Chico, with historic operations and current activity. In the same municipality of La Higuera, the Puquios copper project is advancing, and its logistics converge at the Punta Colorada crossing on Route 5. Its mineral and geological potential is consistent with Sernageomin's public information for the district.

With direct Route 5 frontage, available acreage and proximity to 220 kV electrical infrastructure, the property is suited to mining support facilities, stockpiling, logistics and heavy industry. Evidence of that strategic value: the property has already granted an easement for the infrastructure of a large-scale mining project in the region. It is available for mining and industrial projects; detailed technical and legal information under a non-disclosure agreement.

  • Direct frontage and access to Route 5
  • Norte Chico mining district with current activity
  • Available acreage for support operations and stockpiling
  • Proximity to 220 kV electrical infrastructure
Acreage available

Welcome uses

The property has acreage available and we are open to proposals. The combination of extensive acreage, generation within the property itself and four 220 kV lines also makes it suitable for power-intensive uses.

Sectors of interest:

  • Mining and heavy industry
  • Commercial and industrial subdivision
  • Highway logistics and industrial
  • Telecommunications and antennas
  • Data centers
  • Wind generation
  • Solar PV
  • Battery energy storage (BESS)
  • Electrical transmission
Next step

What we need to know about your project

With these three facts we can tell whether the property fits and under what arrangement: long-term lease, paid land reservation or easement.

  • The acreage you need, in hectares
  • Use: generation, storage, transmission or other
  • Timeline: when you would build and for how long

Does your project need this land?

Detailed technical and legal information available under a non-disclosure agreement.

Let's talk